The Rock Church
Our unique challenge with this job in Gainesville was that the footers would not stay in place with conventional methods. We solved this problem by using a Stayform System which allows the forms to remain steady in the loose Florida soil.
Aerial photos: © AeroPhoto
Owner | The Rock Church |
Location | Gainesville, FL |
Completed | 2020 |
Size | 2,000 CY |
Contractor | Foresight Construction |
Scope | Footers (Stayform System), Slab on Grade |